JavaScript is disabled. Some features may not work.
Estimate — ★ 22.1K GitHub Stars — Install Guide | SkillsNav
🇺🇸 English🇨🇳 中文
SkillsNav
Home

Estimate

★ 22K repomlN/AIntermediateClaude
🤖 AI Summary

This agent analyzes a task description and project context (from CLAUDE.md and design docs), then scans the codebase to assess complexity, dependencies, integration points, and test coverage—using historical sprint data to produce a concrete effort estimate.

How to Install

Claude Code:
git clone --depth 1 https://github.com/Donchitos/Claude-Code-Game-Studios.git && cp Claude-Code-Game-Studios/.claude/skills/estimate ~/.claude/skills/SKILL.md -r

Phase 1: Understand the Task

Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.

Read CLAUDE.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.

Read relevant design documents from design/gdd/ if the task relates to a documented feature or system.


Phase 2: Scan Affected Code

Identify files and modules that would need to change:

  • Assess complexity (size, dependency count, cyclomatic complexity)
  • Identify integration points with other systems
  • Check for existing test coverage in the affected areas
  • Read past sprint data from production/sprints/ for similar completed tasks and historical velocity

Phase 3: Analyze Complexity Factors

Code Complexity: - Lines of code in affected files - Number of dependencies and coupling level - Whether this touches core/engine code vs leaf/feature code - Whether existing patterns can be followed or new patterns are needed

Scope: - Number of systems touched - New code vs modification of existing code - Amount of new test coverage required - Data migration or configuration changes needed

Risk: - New technology or unfamiliar libraries - Unclear or ambiguous requirements - Dependencies on unfinished work - Cross-system integration complexity - Performance sensitivity


Phase 4: Generate the Estimate

## Task Estimate: [Task Name]
Generated: [Date]

### Task Description
[Restate the task clearly in 1-2 sentences]

### Complexity Assessment

| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, gameplay, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | |
| Existing patterns available | [Yes / Partial / No] | |

**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]

### Effort Estimate

| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises |
| Expected | [Y] | Normal pace, minor issues, one round of review |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day |

**Recommended budget: [Y days]**

### Confidence: [High / Medium / Low]

[Explain which factors drive the confidence level for this specific task.]

### Risk Factors

| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|

### Dependencies

| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|

### Suggested Breakdown

| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | |
| 2 | [Core implementation] | [X days] | |
| 3 | [Testing and validation] | [X days] | |
| | **Total** | **[Y days]** | |

### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Any caveats about scope boundaries]

Output the estimate with a brief summary: recommended budget, confidence level, and the single biggest risk factor.

This skill is read-only — no files are written. Verdict: COMPLETE — estimate generated.


Phase 5: Next Steps

  • If confidence is Low: recommend a time-boxed spike (/prototype) before committing.
  • If the task is > 10 days: recommend breaking it into smaller stories via /create-stories.
  • To schedule the task: run /sprint-plan update to add it to the next sprint.

Guidelines

  • Always give a range (optimistic / expected / pessimistic), never a single number
  • The recommended budget should be the expected estimate, not the optimistic one
  • Round to half-day increments — estimating in hours implies false precision for tasks longer than a day
  • Do not pad estimates silently — call out risk explicitly so the team can decide

Details

Category AI/ML → ml
SourceDonchitos/Claude-Code-Game-Studios
SKILL.mdView on GitHub →
Repo Stars★ 22.1K
Est. per SkillN/A (shared across 74 skills from this repo)
DifficultyIntermediate
Risk LevelN/A

Related Skills

Works Well With

Skills from the same repository — often designed to work together